大学生a级毛片免费视频_中文日韩在线观看_中文字幕国_黄色午夜剧场_97人人草_中文字幕欧美日韩

Information
Hot
Contact us
Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
Fax: 021-69024199
Contact: Mr.Peng 
Mobile: 15021113195
E-mail: 502752248@qq.com
Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
http://www.advup.cn/

 

Hunan Peng bathroom safe choice
Your location:Home>>Company dynamics

Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 国产欧美一区二区三区免费 | 免费亚洲精品 | 91精品久久久久久久久久 | 亚洲www啪成人一区二区 | 91亚洲国产成人久久精品网站 | 国产美女在线精品 | 午夜成人影视 | 天天爽夜夜爽人人爽一区二区 | 亚洲国产aⅴ精品一区二区 麻豆91精品91久久久 | 99久久免费看精品国产一区非洲 | av高清一区二区三区 | 亚洲美女午夜一区二区亚洲精品 | 国产一级片免费观看 | 综合久久中文字幕 | 国产 欧美 精品 | 久久久久国产精品www | 91精品久久久久久久久中文字幕 | 久久久亚洲高清 | 国产高清一区二区三区四区 | 免费看麻豆视频 | 91免费视频在线 | 91麻豆精品国产91久久久资源速度 | 亚一区 | 国产在线精品观看 | 91污视频在线观看 | 91视频免费版污 | 久久久久久久久久久亚洲 | 一级片在线观看网站 | 亚洲最大福利视频 | 国产成人免费 | 97国产超碰 | 国产网址视频 | 亚洲综合色成在线播放 | 91亚洲欧洲 | 国产精品一区99 | 中文字幕一精品亚洲无线一区 | 亚洲精品视频在线观看视频 | 91视频在线免费 | 亚洲美女免费 | 91视频最新网站 | 国产精品日韩在线观看一区二区 |