大学生a级毛片免费视频_中文日韩在线观看_中文字幕国_黄色午夜剧场_97人人草_中文字幕欧美日韩

Information
Hot
Contact us
Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
Fax: 021-69024199
Contact: Mr.Peng 
Mobile: 15021113195
E-mail: 502752248@qq.com
Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
http://www.advup.cn/

 

Hunan Peng bathroom safe choice
Your location:Home>>Company dynamics

Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 久久久91精品 | 国产视频一区二区三区四区五区 | 91av电影在线观看 | 国产成人精品一区二区三区免费 | 亚洲专区一区虐另类调教 | 91亚洲国产成人精品一区二三 | 中文一区 | 91视频免费看网站 | 精品在线观看视频 | 久久久二区 | 91日本欧美高清人术艺术 | 91视频合集 | 亚洲综合色视频在线观看 | 成人av一区二区在线观看 | 91成人在线免费观看 | 91亚洲国产成人精品一区二三 | 亚洲人午夜色婷婷 | 午夜小毛片 | 久久久久国产欧美 | 国产成人啪午夜精品网站男同 | 快播91| 国产欧美日韩一区二区在线 | 91手机在线看片 | 久久成人在线观看 | 一级黄免费| 国产二区精品视频 | 亚洲一区二区三区四区五区中文 | 久久精品国产精品 | 91成人免费视频 | 91精品大片 | 国产激情91久久精品导航 | 热九九精品 | 久久久成人精品视频 | 黑人巨大精品欧美久久 | 亚洲欧洲精品久久 | 日韩精品成人免费视频 | 91成人小视频 | 久久久久久久久久久久久91 | 日韩精品一二区 | 国产区久久 | 一区二区成人在线 |